What this covers
- Site-specific installation planning
- Unpacking, assembly and functional checks as agreed
- Handover notes for the installed configuration
- Discussion of IQ/OQ/PQ documentation where you require it — scope confirmed per job
Equipment commonly discussed
- Laboratory and clean-environment equipment
- Medical gas accessories and suction systems
- Monitoring and ventilation devices
Limits of this page
Qualification protocols are prepared against your quality system and the manufacturer’s instructions. They are not a substitute for the facility’s own validation master plan.
Enquire about installation