Skip to content
MTS Lab

Lifecycle

Installation

Available now

Installation support is listed on the current engineering pages. Work starts from a site assessment: utilities, access, manufacturer instructions and the records you need at handover.

What this covers

  • Site-specific installation planning
  • Unpacking, assembly and functional checks as agreed
  • Handover notes for the installed configuration
  • Discussion of IQ/OQ/PQ documentation where you require it — scope confirmed per job

Equipment commonly discussed

  • Laboratory and clean-environment equipment
  • Medical gas accessories and suction systems
  • Monitoring and ventilation devices

Limits of this page

Qualification protocols are prepared against your quality system and the manufacturer’s instructions. They are not a substitute for the facility’s own validation master plan.

Enquire about installation

Tell us about your equipment

Include the equipment type, model, location and the work required. The relevant office will confirm scope and availability.

Request a Quote